EV

INSTALLATION & SERVICES

From the wall
to your next journey.

A good installation starts with the property. Plan the cable route, distribution box and earthing with our team—whether you buy your charger from us or already have one.

Request services ↗

WHAT WE PLAN WITH YOU

The details around
the charger.

01

Survey the site

Share your location and preferred survey date. We contact you to confirm an appointment; selecting a date online does not book a visit.

02

Define the scope

Our team checks the supply, protection, earthing and cable route against the chosen charger. Cable lengths and final requirements are confirmed at the survey.

03

Agree the itemised quotation

Review materials and labour separately. Earth boring is optional in the online quotation, and services can be requested without a charger.

CLEAR FROM THE START

Installation rate card.

The same current rates used in your online quotation. Final quantities and scope depend on the site.

MATERIALS

Power Distribution Box (Single Phase)

For 3 kW charger selection

Rs 9,000 / unit
MATERIALS

Power Distribution Box (Single Phase)

For 7 kW charger selection

Rs 16,000 / unit
MATERIALS

Power Distribution Box (3Phase)

For 22 kW charger selection

Rs 38,000 / unit
MATERIALS

6 mm² Low-Smoke, Fire-Resistant Cable

Rs 125 / ft
MATERIALS

Earth Wire

Rs 100 / ft
SERVICE · OPTIONAL

Earth Boring

Rs 18,000 / job
SERVICE

Installation Labour

Rs 15,000 / job

Cable and earth-wire quantities are measured in feet. Leave unknown lengths blank in the quotation; the rates remain visible and unmeasured amounts are added after confirmation. A cable listing is a quoted material, not a universal sizing recommendation.

Your charger.
Our installation support.

Tell us what you already have and select the services you need.

Build my services quotation ↗